2026 (22)
2025 (79)
2024 (92)
2023 (88)
2022 (80)
2021 (105)
2020 (101)
2019 (121)
2018 (87)
2017 (128)
2016 (137)
2015 (139)
2014 (168)
2013 (145)
2012 (126)
2011 (122)
2010 (129)
2009 (120)
2008 (135)
2007 (122)
2006 (58)
2005 (50)
2004 (47)
2003 (39)
2002 (73)
2001 (53)
2000 (75)
1999 (31)
대한건축학회지회연합회 대한건축학회연합논문집 제10권 제3호 통권 35호 2008.10 pp.257-264
※ 기관로그인 시 무료 이용이 가능합니다.
4,000원
Apartment Reconstruction project causes lots of conflicts among stakeholders who don’t have professional knowledge on a complicated work-flow. In case these conflicts occur, the project might not be well by the damage passed to parties, and so the project cost might be increased, the project might be delayed and hazy as well if the conflicts are not resolved quickly. However, the damage would be indirectly and directly brought to the main parties in apartment reconstruction project because the conflicts are not managed. Thus, an effective conflict assessment should be preceded, and a process and a system for managing the conflicts should be developed to prevent and settle the conflicts. The purpose of this study classifies the conflicts which are occurred on each phases of the project based on principal facts, and presents foundational decision-making information to develop conflict management system through conflict assessment to each stakeholder.
대한건축학회지회연합회 대한건축학회연합논문집 제10권 제3호 통권 35호 2008.10 pp.265-272
※ 기관로그인 시 무료 이용이 가능합니다.
4,000원
Since the occurrence of defects plays a very crucial role in maintenance expenses, consumer inconvenience, corporative brand image, and reliability issues, it is necessary to address flaws and prepare measures to prevent them. The aim of this present study is to identify such measures to be incorporated systematically in construction work. To this end, five apartment complexes that were already occupied were sampled to collect data and ultimately determine improvement measures that addressed inconveniences of everyday occupants. In order to collect data, constructors 'flaw-acceptance-ledgers and occupants' first and second year flaw-maintenance-requests were divided into drawing up stage and construction stage, and then classified the two stages by work categories, causes, and patterns. In addition, visiting examination was carried out to supplement data and clarify unclear portions. Study findings are as follows: If there are many state-of-the-art information and communication equipments, the flows in this part are also increased rapidly. Especially in the apartment complex where combination equipments to which multi-sources are supplied, there occur a lot of flaws. And as for the classification of flaw patterns, the flaw of lighting equipments is most frequent (42.8%). The most important factor of home networks and unmanned defense equipments is reliability. Therefore, applying them to construction sites needs an examination of reliabilities and contents, and careful selection of functions. And in case of ordering lighting equipments, it is necessary to examine the detailed standards of stabilizers, the coating method of equipments, and the acceptance in the factory in production, and to train craftsmen on-site before installing the equipments.
0개의 논문이 장바구니에 담겼습니다.
선택하신 파일을 압축중입니다.
잠시만 기다려 주십시오.