Earticle

현재 위치 Home

Issues

대한안전경영과학회 학술대회논문집

간행물 정보
  • 자료유형
    학술대회
  • 발행기관
    대한안전경영과학회 [Korea Safety Management & Science]
  • 간기
    부정기
  • 수록기간
    1999 ~ 2022
  • 주제분류
    공학 > 안전공학
  • 십진분류
    KDC 530 DDC 620
2003년도 대한안전경영과학회 춘계학술대회 (34건)
No

Session 8 : 안전과 CRM, 좌장 : 정혜운(오산대학)

31

4,000원

EPC seeks to minimize variability by transferring the output variable to a related process input(controllable) variable, while SPC seeks to reduce variability by detecting and eliminating assignable causes of variation. Tn the case of product control, a very reasonable objective is to try to minimize the variance of the output deviations from the target or set point. We consider an alternative EPC model with second-order autoregressed disturbance. We compare three control systems; EPC, EPC combined system with EWMA, CUSUM and Shewhart. This paper shows through simulation that the performance of the integrated model of EPC and SPC is more preferable than that of EPC.

32

4,000원

There is only one server available and arriving work require services from this server. Job are processed by the machine one at a time. The most common objective is to sequence jobs on the severs so as to minimize the penalty for being late, commonly called tardiness penalty Based on other objectives, many criteria may serve as s basis for developing job schedules. Therefore, this study tries to proposed that Scheduling by customer needs group for minimizing the problem and reducing inventory, product development time, cycle time, and order lead time.

33

4,000원

In fact, some cases that successfully introduced CRM show that CRM is migrating from small scale which is typical when introduced to larger scale through various tests. The process also comprises all strategic planning, capital investments, management decisions, and tasks necessary to create a new product. manufacturing processes must be created so that the product can be produced in the product facility Therefore, this study tries to segment customer for the sieving the problem. And it make efficient customer management.

34

4,000원

Manufacturing companies must possess a new type of production system with characteristics of reconfigurability, reusability and scalability (Dove 1995), i.e. an agile manufacturing system. Such system will allow flexibility not only in producing a variety of part, but also in changing the system itself, which is a difference form flexible manufacturing systems. A fundamental early step in the reconfiguring process for agile manufacturing system is to develop a model that adequately describes the proposed systems, in order to be able to study and evaluate the impact of the reconfiguring decision on the system performance, before its construction. Therefore, in this paper, an Object & Knowledge-based Interval Timed Petri-Net (OKITPN) approach is proposed.

 
1 2
페이지 저장