A contract dispute is an inevitable factor in construction project. Because of this dispute, many contract parties may have difficulties escaping a lot of contract risks. The best choice is to solve the risks without conflict. Some matters go beyond the ability of Construction Manager or Supervisor, and these may reach the limit of patience. Recently some Owner are introducing Dispute Review Board(DRB), a type of ADR. To universally introduce DRB, the impartiality of DRB participants should be verified. Therefore the concept of the neutrality in Mediation were studied, and Mediation described in the Framework Act on the Construction Industry were analyzed, and the manner to guarantee the neutrality of DRB participants were suggested in this study.
목차
Abstract 1. 서 론 1.1 연구의 배경과 목적 1.2 연구의 방법 및 절차 2. 예비적 고찰 2.1 중립성의 의의 2.2 현장협의체의 개념 2.3 연구동향 3. 건설분쟁조정기구의 중립성 3.1 국제계약분쟁조정위원회 3.2 건설분쟁조정위원회 3.3 계약분쟁자문소위원회 3.4 검토 결과 4. 현장협의체의 중립성 4.1 현장협의체의 개요 4.2 사전분쟁조정위원회 4.3 분쟁조정위원회 4.4 분석 결과 5. 현장협의체의 중립성담보 방안마련 5.1 위원 선정방식의 적합성 5.2 위원선정의 평등성 5.3 계약당사자의 위원선정 승인권 5.4 특별관계 부존재와 총괄 5.5 중립성 구성요소 검증 6. 결론 참고문헌
대한건축학회지회연합회 [The Regional Association of Architectural Institute of Korea]
설립연도
2000
분야
공학>건축공학
소개
본회는 건축에 관한 학술․ 예술․ 기술을 연구 연마하는 지회회원들의 입지향상과 회원상호간의 친목도모와 함께 건축 문화창달에 기여함을 목적으로 한다.
목적을 달성하기 위하여 다음의 사업을 한다.
1. 지회회원의 입지향상과 친목도모
2. 건축에 관한 조사․연구지도 및 이에 관련된 사업
3. 회지, 논문집, 연구보고서 기타 건축에 관한 도서의 간행
4. 건축에 관한 강습회․강연회․간담회․전람회․견학회 등의 개최
5. 건축에 관한 계획, 감독, 기술검토에 대한 국가공공기관 기타의뢰에 관한 사항
6. 국내외 관계 제 학회와의 교류 및 회의참석
7. 기타 본회 목적달성에 필요한 사업
간행물
간행물명
대한건축학회연합논문집 [Journal of the Regional Association of Architectural Institute of Korea]