Usually, processing whole project or a part of frame work delays due to acceleration, changing orders, management, characters of projects, overtime, worker crowding, early occupation in the field of construction. Through a whole project, these factors cause decreasing construction labor-productivity which is the most dependent in business of construction. These kind of decreasing of construction labor-productivity cause many negative effects, just as extension of time, increasing cost in project of construction. Regardless of characters of construction or decreasing labor-productivity, extension of time is a incident which needs acceleration, also it cause a high possibility of claim and dispute. The productivity has just a broad meaning in business of construction. That's why it's difficult to apply in the field of construction. Especially, factors increasing or decreasing labor-productivity is defined by analysis of working as qualitative and outlined evaluation. However, study of the each factor decreasing construction labor-productivity analysis has not researched, because of difficulty of systematic measurement and management. The existed studies about management of productivity are just focused on estimation of productivity, not on evaluation of productivity. It was true that I couldn't examine clearly about the analysis of how much important per each the factor which have influence on labor-productivity because of the characteristic as qualitative that the labor productivity have. On this study, I tried to get the factors decreasing of labor-productivity with gathering opinions of panels of expert's studies about the factors decreasing of labor-productivity on project of construction through Delphi method and I evaluated the result factors as quantitatively and subjectively about importance of factors decreasing construction labor-productivity analysis, using AHP Method by Saaty. Also, using Delphi and AHP method, I suggest substantiated method qualitative factors are measured by quantitative criteria.
목차
Abstract 1. 서론 1.1 연구의 배경 및 목적 1.2 연구 방법 및 내용 2. 이론적 고찰 2.1 노동생산성의 고찰 2.2 의사결정 분석기법의 고찰 3. 건설노동생산성 저하요인의 추출 3.1 노동생산성 저하요인 3.2 실증분석 4. 노동생산성 저하요인의 분석 4.1 계층구조의 구성 4.2 중요도 측정 및 척도 4.3 계층분석법(AHP)의 적용 4.4 노동생산성 저하요인별 가중치 산정 5. 의사결정 방법을 활용한 방법론의 검증 5.1 현장조사의 실시 5.2 방법의 검증 6. 결론 참고문헌
키워드
건설노동생산성 저하요인Delphi기법계층분석법실증적 분석방법Factors Decreasing Construction Labor-ProductivityDelphi MethodAHP MethodAnalysis Method of Substantiated
대한건축학회지회연합회 [The Regional Association of Architectural Institute of Korea]
설립연도
2000
분야
공학>건축공학
소개
본회는 건축에 관한 학술․ 예술․ 기술을 연구 연마하는 지회회원들의 입지향상과 회원상호간의 친목도모와 함께 건축 문화창달에 기여함을 목적으로 한다.
목적을 달성하기 위하여 다음의 사업을 한다.
1. 지회회원의 입지향상과 친목도모
2. 건축에 관한 조사․연구지도 및 이에 관련된 사업
3. 회지, 논문집, 연구보고서 기타 건축에 관한 도서의 간행
4. 건축에 관한 강습회․강연회․간담회․전람회․견학회 등의 개최
5. 건축에 관한 계획, 감독, 기술검토에 대한 국가공공기관 기타의뢰에 관한 사항
6. 국내외 관계 제 학회와의 교류 및 회의참석
7. 기타 본회 목적달성에 필요한 사업
간행물
간행물명
대한건축학회연합논문집 [Journal of the Regional Association of Architectural Institute of Korea]