The purpose of this paper is to improve the rationality of PBL item selection by reflecting RAM-C analysis in item selection decision-making for PBL. To this end, the development of the RAM-C-based PBL system was reviewed and the Air Force KT/A-1 aircraft and the mid-range air control radar PBL project were analyzed as cases. In the current system, RAM-C analysis results are used only at the level of reference data for project cost estimation or quotation calculation. In order to improve this, this paper proposed a plan to institutionalize the item selection procedure that mandates the use of cost-driver item lists and recommended items and availability simulation results provided in RAM-C analysis, improve RAM-C reliability through systematic collection and management of data, and combine cost analysis based on consumption performance and RAM-C results. The proposed improvement plan can contribute to strengthening data-based decision-making in future PBL projects.
한국어
본 논문의 목적은 신뢰성기반비용관리(RAM-C) 분석을 성과기반군수지원(PBL) 품목선정 의사결정에 반영하여 PBL 품목 선정의 합리성을 개선하는 것이다. 이를 위해 RAM-C 기반 PBL 제도의 발전 경과를 고찰하고, 공군 KT/A-1 항공기와 중 거리 항공통제 레이더 PBL 사업을 사례로 분석하였다. 현행 제도에서는 RAM-C 분석결과는 사업비용 추정 또는 견적 산출 을 위한 참고자료 수준에서만 활용되고 있었다. 본 논문에서는 이를 개선하기 위해 RAM-C 분석에서 제공되는 비용유발 품 목 리스트 및 추천 품목과 가용도 시뮬레이션 결과의 활용을 의무화하는 품목선정 절차의 제도화, 데이터의 체계적 수집과 관리를 통한 RAM-C 신뢰성 제고, 소모실적 기반 비용분석과 RAM-C 결과를 병행하는 방안을 제안했다. 제안한 개선방안은 향후 PBL 사업에서 데이터 기반 의사결정을 강화에 기여할 수 있을 것이다.
목차
ABSTRACT 초록 Ⅰ. 서론 Ⅱ. PBL 및 RAM-C 관련 연구 2.1 국내 연구 동향 2.2 해외 연구 동향 2.3 시사점 Ⅲ. PBL과 RAM-C 3.1 PBL 개념 3.2 공군의 PBL 절차 3.3 RAM-C 개념 Ⅳ. RAM-C 적용 제한사항 4.1 RAM-C 분석 대상장비 현황 4.2 RAM-C 기반 PBL 품목선정 절차 제한사항 Ⅴ. PBL 품목선정 절차 개선방안 5.1 RAM-C 분석결과 활용 제도화 5.2 RAM-C 신뢰성 향상을 위한 데이터 관리 5.3 소모실적 기반 비용분석 병행 Ⅵ. 결론 참고문헌
키워드
성과기반군수지원신뢰성기반비용관리비용추정종합군수지원PBLRAM-CCost EstimationIntegrated Logistics Support