Domestic as well as global automobile manufacturers are making greater efforts in cost reduction to strengthen the competitiveness. In this study, we developed a program to effectively manage standard time of automobile assembly line, and confirm based on A-automobile factory data. For the purpose, we develop the system which is possible to manage standard time as well as calculate man-hour for automobile assembly line.
목차
Abstract 1. 서론 2. 이론적 배경 2.1 PTS(Predetermined Time Standards)기법 2.2 MODAPTS기법 2.3 자동차 공장의 부품조달 물류 2.4 유사한 연구와 비교 3. 본론 3.1 자재조달 물류의 프로세스 및 작업 3.2 공수 산출 과정 3.3 조립라인 자재 조달 물류의 공수관리시스템 4. 결론 및 향후 연구 과제 5. References