근로시간 단축에 따른 건축기술자의 근로실태 변화 및 요구사항 분석
Analysis of Changes in Labor Conditions and Requirements among Construction Engineers Due to Working Time Reduction
In order to improve working environments, South Korea implemented a 52-hour workweek starting from July 1, 2018. However due to the characteristics of the construction industry in which workers do their duties in accordance with the construction process, it seems to be unreasonable to apply a general working time reduction system to the construction industry. In this regard, this study aims to analyze the countermeasures of various construction companies as well as construction engineers’ labor conditions and requirements after the enforcement of the working time reduction system. The research results showed that the working hours of construction engineers decreased slightly after the enforcement of the working time reduction system. Moreover, the construction companies responded to the working time reduction system by introducing various systems. The directions to become acquainted with the working time reduction system and methods to complement the reduction in workloads required by construction engineers were analyzed so as to establish the appropriate response to establish the working time reduction system in the future. The analysis found that in the case of the working time reduction system, the method of adjusting commute time, flexible work arrangements, and different time commuting system were most favored among construction workers, while the intensive work system was most favored by them as a method to complement the reduction in workload due to the reduced working hours. Therefore, it is expected that the findings of this study can be used as necessary data to establish a suitable method for future policy-making from the viewpoint of both the government and corporations.
목차
Abstract 1. 서론 1.1 연구배경 및 목적 1.2 연구범위 및 방법 1.3 기존연구 2. 근로시간 단축 개요 및 국내외 시행사례 2.1 법정근로시간 단축 개요 2.2 법정근로시간 단축제도의 국내외 시행사례 3. 건축기술자의 근로실태 변화 분석 3.1 설문개요 3.2 건축기술자의 근로실태 변화 분석 3.3 근로시간 단축에 따른 기업별 대응 실태 분석 4. 건축기술자의 요구사항 분석 4.1 근로시간 단축 요구사항 4.2 근로시간 단축에 따른 업무량 감소 보완방안 분석 5. 결론 REFERENCES
키워드
근로시간 단축건축기술자워라밸근로환경Working time reductionConstruction engineersWork-life balanceLabor conditions
대한건축학회지회연합회 [The Regional Association of Architectural Institute of Korea]
설립연도
2000
분야
공학>건축공학
소개
본회는 건축에 관한 학술․ 예술․ 기술을 연구 연마하는 지회회원들의 입지향상과 회원상호간의 친목도모와 함께 건축 문화창달에 기여함을 목적으로 한다.
목적을 달성하기 위하여 다음의 사업을 한다.
1. 지회회원의 입지향상과 친목도모
2. 건축에 관한 조사․연구지도 및 이에 관련된 사업
3. 회지, 논문집, 연구보고서 기타 건축에 관한 도서의 간행
4. 건축에 관한 강습회․강연회․간담회․전람회․견학회 등의 개최
5. 건축에 관한 계획, 감독, 기술검토에 대한 국가공공기관 기타의뢰에 관한 사항
6. 국내외 관계 제 학회와의 교류 및 회의참석
7. 기타 본회 목적달성에 필요한 사업
간행물
간행물명
대한건축학회연합논문집 [Journal of the Regional Association of Architectural Institute of Korea]