This study analyzed Changes in water level, velocity and water exchange rate of Cheongna Central Lake using MIKE 21 Flexible Mesh (FM) model. The Artificial Lake that changes according to the operation conditions such as the use of flow generator, drainage location and discharge supply condition. The results revealed that the rate of a lake’s water cycle rose when the flow generator operated, causing the water to run at higher velocity in the stagnation regions. Especially, operating the drainage halls located in both ends of the lake showed better water cycle efficiency than using a drainage hall in the center of the lake. This study suggests management plans to solve dead water regions and enhance the water cycle in the artificial lake. The test result from numerical model in this study will hopefully serve as fundamental data used on designing similar facilities going forward.
목차
Abstract 1. Introduction 2. Numerical Modeling 2.1. Model Setup 2.2. Verification of Numerical Model 2.3. Experimental Conditions and Analysis Methods 3. Results of Numerical Simulation 3.1. Change in Water Level and Velocity 3.2. Analysis of Water Exchange Rate 4. Conclusions Acknowledgments References
보안공학연구지원센터(IJCA) [Science & Engineering Research Support Center, Republic of Korea(IJCA)]
설립연도
2006
분야
공학>컴퓨터학
소개
1. 보안공학에 대한 각종 조사 및 연구
2. 보안공학에 대한 응용기술 연구 및 발표
3. 보안공학에 관한 각종 학술 발표회 및 전시회 개최
4. 보안공학 기술의 상호 협조 및 정보교환
5. 보안공학에 관한 표준화 사업 및 규격의 제정
6. 보안공학에 관한 산학연 협동의 증진
7. 국제적 학술 교류 및 기술 협력
8. 보안공학에 관한 논문지 발간
9. 기타 본 회 목적 달성에 필요한 사업
간행물
간행물명
International Journal of Control and Automation
간기
월간
pISSN
2005-4297
수록기간
2008~2016
십진분류
KDC 505DDC 605
이 권호 내 다른 논문 / International Journal of Control and Automation Vol.9 No.8