The complexity and turbulence of a project may lead to its unpredictability, so risk management is increasingly important. This paper focuses on the application of Monte Carlo method in project management as follow: first, deals with the estimated scale with Wide band Delphi method and gets the interval of prediction after making repeated samples in line with the generally adopted probability models; then figures out the workloads according to the management abilities and historical date; finally obtains the progress of the project with a method combining COCOMOⅡ method and then improves the ability to predict and control management activities with uncertainties.
목차
Abstract 1. Introduction 2. Monte Carlo Method 2.1 Introduction of Monte Carlo Method 2.2 Definitions of Monte Carlo Method 2.3Calculation of Monte Carlo Method 2.4 Matlab Introduction 3. The Basic Steps OF Monte Carlo Method 3.2 Estimating the Workload 3.3 Estimate Progress of the Project 4. Analysis and Deduction 4.1 Estimating Scale of the Project 4.2 Estimating the Workload 4.3 Estimate Progress of the Project 5. Conclusions References
보안공학연구지원센터(IJUNESST) [Science & Engineering Research Support Center, Republic of Korea(IJUNESST)]
설립연도
2006
분야
공학>컴퓨터학
소개
1. 보안공학에 대한 각종 조사 및 연구
2. 보안공학에 대한 응용기술 연구 및 발표
3. 보안공학에 관한 각종 학술 발표회 및 전시회 개최
4. 보안공학 기술의 상호 협조 및 정보교환
5. 보안공학에 관한 표준화 사업 및 규격의 제정
6. 보안공학에 관한 산학연 협동의 증진
7. 국제적 학술 교류 및 기술 협력
8. 보안공학에 관한 논문지 발간
9. 기타 본 회 목적 달성에 필요한 사업
간행물
간행물명
International Journal of u- and e- Service, Science and Technology
간기
격월간
pISSN
2005-4246
수록기간
2008~2016
십진분류
KDC 505DDC 605
이 권호 내 다른 논문 / International Journal of u- and e- Service, Science and Technology Vol.8 No.9