Although schedule management is widely known to construction companies as a direct indication of project management information system and systematization, most of studies in the area have been focused on either a specific technique for reducing dates or a method of schedule analysis. How such techniques and methods have been being used by medium-sized construction companies based in Busan, Korea were studied. Moreover, the results were compared to that of a previous research, which lead to a few solutions that the companies can improve their practices, namely ‘formal work procedure’, ‘organizing fully responsible division for schedule management’, and ‘running regular education program’.
목차
Abstract 1. 서론 1.1 연구배경 및 목적 1.2 연구범위 및 방법 2. 선행연구고찰 및 공정관리 2.1 문헌연구 2.2 공정의 주요 관리요소 3. 공정 관리실태 조사 및 분석 3.1 조사개요 3.2 공정 관리수준 실태 3.3 공정 관리체계 실태 3.4 공정 관리전담 인력 실태 4. 기존 연구 사례와 비교 분석 4.1 개요 및 일반사항 4.2 공정 관리수준 비교 4.3 공정 관리체계 비교 4.4 공정 관리인력 비교 5. 부산지역 건설기업의 공정관리 문제점 및 개선방향 6. 결론 참고문헌
키워드
공정관리공정관리요소Schedule ManagementSchedule Management element
대한건축학회지회연합회 [The Regional Association of Architectural Institute of Korea]
설립연도
2000
분야
공학>건축공학
소개
본회는 건축에 관한 학술․ 예술․ 기술을 연구 연마하는 지회회원들의 입지향상과 회원상호간의 친목도모와 함께 건축 문화창달에 기여함을 목적으로 한다.
목적을 달성하기 위하여 다음의 사업을 한다.
1. 지회회원의 입지향상과 친목도모
2. 건축에 관한 조사․연구지도 및 이에 관련된 사업
3. 회지, 논문집, 연구보고서 기타 건축에 관한 도서의 간행
4. 건축에 관한 강습회․강연회․간담회․전람회․견학회 등의 개최
5. 건축에 관한 계획, 감독, 기술검토에 대한 국가공공기관 기타의뢰에 관한 사항
6. 국내외 관계 제 학회와의 교류 및 회의참석
7. 기타 본회 목적달성에 필요한 사업
간행물
간행물명
대한건축학회연합논문집 [Journal of the Regional Association of Architectural Institute of Korea]