Earticle

현재 위치 Home

Optimal Number of Failures before Group Replacement under Minimal Repair

첫 페이지 보기
  • 발행기관
    대한안전경영과학회 바로가기
  • 간행물
    대한안전경영과학회지 KCI 등재후보 바로가기
  • 통권
    제6권 제1호 (2004.03)바로가기
  • 페이지
    pp.61-70
  • 저자
    유영관
  • 언어
    영어(ENG)
  • URL
    https://www.earticle.net/Article/A154803

※ 기관로그인 시 무료 이용이 가능합니다.

4,000원

원문정보

초록

영어
In this paper, a group replacement policy based on a failure count is analysed. For a group of identical repairable units, a maintenance policy is performed with two phase considerations: a repair interval phase and a waiting interval phase. Each unit undergoes minimal repair at failure during the repair interval. Beyond the interval, no repair is made until a number of failures. The expected cost rate expressions under the policy is derived. A method to obtain the optimal values of decision variables are explored. Numerical examples are given to demonstrate the results.

목차

Abstract
 1. Introduction
 2. Expected Cost Rate under the Policy
 3. Obtaining the Optimum Decision Variables
 4. Numerical Examples
 5. References

키워드

minimal repair group replacement maintenance policy

저자

  • 유영관 [ Young Kwan, Yoo | School of Business Administration, Halla University ]

참고문헌

자료제공 : 네이버학술정보

간행물 정보

발행기관

  • 발행기관명
    대한안전경영과학회 [Korea Safety Management & Science]
  • 설립연도
    1999
  • 분야
    공학>안전공학
  • 소개
    안전경영에 관한 학문과 기술을 발전,보급,응용하여 안전기술 및 관리기술의 진흥에 공헌하며, 재해예방을 통한 안전사회의 구현을 그 목적으로 함.

간행물

  • 간행물명
    대한안전경영과학회지 [Journal of Korea Safety Management & Science]
  • 간기
    계간
  • pISSN
    1229-6783
  • eISSN
    2288-1484
  • 수록기간
    1999~2025
  • 십진분류
    KDC 530 DDC 620

이 권호 내 다른 논문 / 대한안전경영과학회지 제6권 제1호

    피인용수 : 0(자료제공 : 네이버학술정보)

    함께 이용한 논문 이 논문을 다운로드한 분들이 이용한 다른 논문입니다.

      페이지 저장