The estimation of construction duration is one of the most critical tasks in construction project planning, In the initial planning phase, however, estimating reliable project duration is an intractable problem. Since there are limited information and details in the preliminary planning, CBR(Case-Based Reasoning) can be considered as useful approach to solve this problem. Therefore this paper presents DEPOT(Duration Estimator for PrOjecT) as CBR-based construction duration estimating tool that is designed to estimate using available data at the early phase of project planning. DEPOT provides the similarity scatter diagram relating the similarity of past cases against the revised duration estimate and the list of similar cases to help retrieve a more optimal case for new construction project.
목차
Abstract 1. 서론 1.1 연구배경 및 목적 1.2 연구범위 및 방법 2. 예비적 고찰 2.1 CBR 2.2 공사기간 산정 3. 시스템 개발 3.1 시스템 개요 3.2 기간추정 프로세스 3.3 영향요인 설정 3.4 속성유사도 측정 3.5 가중치 설정 3.6 사례유사도 측정 3.7 기간보정 3.8 유사도분포 3.9 유사사례리스트 4. 결론 참고문헌
키워드
공정관리공사기간추정사례기반추론Time ManagementEstimation of construction durationCase-based reasoning (CBR)
대한건축학회지회연합회 [The Regional Association of Architectural Institute of Korea]
설립연도
2000
분야
공학>건축공학
소개
본회는 건축에 관한 학술․ 예술․ 기술을 연구 연마하는 지회회원들의 입지향상과 회원상호간의 친목도모와 함께 건축 문화창달에 기여함을 목적으로 한다.
목적을 달성하기 위하여 다음의 사업을 한다.
1. 지회회원의 입지향상과 친목도모
2. 건축에 관한 조사․연구지도 및 이에 관련된 사업
3. 회지, 논문집, 연구보고서 기타 건축에 관한 도서의 간행
4. 건축에 관한 강습회․강연회․간담회․전람회․견학회 등의 개최
5. 건축에 관한 계획, 감독, 기술검토에 대한 국가공공기관 기타의뢰에 관한 사항
6. 국내외 관계 제 학회와의 교류 및 회의참석
7. 기타 본회 목적달성에 필요한 사업
간행물
간행물명
대한건축학회연합논문집 [Journal of the Regional Association of Architectural Institute of Korea]