농지 접근성 개선 사업의 비농업적 활용 방지를 위한 관리 방안 연구 - 제주특별자치도 농기계 경작로 개설 사업을 중심으로 -
A Study on Management Strategies to Prevent Non-Agricultural Use of Farmland Accessibility Improvement Projects - A Case Study of the Agricultural Machinery Access Road Project in Jeju Special Self-Governing Province -
This study aims to propose management strategies for preventing non-agricultural use in farmland accessibility improvement projects, focusing on the Agricultural Machinery Access Road Project in Jeju Special Self-Governing Province. It reviews previous studies, ordinances, management guidelines, and the 2024 project status, and analyzes institutional and operational issues as well as land category composition and accessibility to urban areas around newly constructed project sites. The results suggest that the characteristics of the project sites are difficult to explain solely by the administrative distinction between urban districts and eup/myeon areas, and that the need for preventive management varies depending on locational conditions such as land category composition, urban area accessibility, elevation, and surrounding land-use conditions. Therefore, preventing non-agricultural use requires location-based site selection, differentiated management by project type, institutional criteria for preventing de facto road formation, and a post-project monitoring and maintenance system. This study is significant in that it analyzes farmland accessibility improvement projects from the perspective of farmland accessibility change and sustainable farmland management.
목차
Abstract 1. 서론 1.1 연구의 배경 및 목적 1.2 연구의 범위와 방법 2. 이론적 고찰 2.1 농업생산기반시설과 농지 접근성 개선 사업 2.2 농지 접근성 변화와 농지 이용 변화 2.3 선행연구 검토와 연구의 차별성 3. 제주특별자치도 농기계 경작로 개설 사업 운영 실태와 한계 3.1 제도적 근거와 운영 기준 3.2 농기계 경작로 개설 사업 현황 3.3 농기계 경작로 개설 사업 운영의 한계 및 쟁점 4. 농기계 경작로 개설 사업의 입지 특성 분석과 관리 방안 4.1 분석 개요 및 대상지 설정 4.2 사업대상지 주변 지목 구성 분석 4.3 사업대상지 도시지역 접근성 분석 4.4 비농업적 활용 방지를 위한 관리 방안 5. 결론 참고문헌