The boiler drum water level control system is one of the most important components of a power plant. The operating water level control system is increasingly recognized as a capital asset that should be routinely maintained and monitored. The performance assessment technology can achieve measures of the level of difficulty in controlling the water level from routine operating data, however, which is still an open problem; thus, in this paper the performance assessment technology will be brought into the feedforward-cascade drum water level control system. The performance benchmark and the associated benchmark controller are also proposed. A numerical example for the drum water level control system shows the effectiveness of the proposed method.
목차
Abstract 1. Introduction 2. Drum Water Level Control System Description 3. Performance Assessment for the Drum Water Level Control System 3.1. MV Performance Benchmark of the Drum Water Level Control System 3.2. Estimation of MV Performance Benchmark of the Drum Water Level Control System 3.3. Performance Index of the Drum Water Level Control System 4. Numerical Example 5. Conclusions References
Zhi Zhang [ Postdoctoral Programme of China Industrial Security Research Center, Beijing Jiaotong University, China / School of Electrical Engineering, Beijing Jiaotong University, Beijing, China ]
보안공학연구지원센터(IJCA) [Science & Engineering Research Support Center, Republic of Korea(IJCA)]
설립연도
2006
분야
공학>컴퓨터학
소개
1. 보안공학에 대한 각종 조사 및 연구
2. 보안공학에 대한 응용기술 연구 및 발표
3. 보안공학에 관한 각종 학술 발표회 및 전시회 개최
4. 보안공학 기술의 상호 협조 및 정보교환
5. 보안공학에 관한 표준화 사업 및 규격의 제정
6. 보안공학에 관한 산학연 협동의 증진
7. 국제적 학술 교류 및 기술 협력
8. 보안공학에 관한 논문지 발간
9. 기타 본 회 목적 달성에 필요한 사업
간행물
간행물명
International Journal of Control and Automation
간기
월간
pISSN
2005-4297
수록기간
2008~2016
십진분류
KDC 505DDC 605
이 권호 내 다른 논문 / International Journal of Control and Automation Vol.9 No.12