Abstract 1. Introduction 2. Risk Measurement of Multi-Project Human Resource Constrained Allocation Based on Cut Sets 2. 1. Definition and Properties ofWeighted Probability Mean Value Based on Cut Sets 2. 2. Definition and Properties ofWeighted Probability Variance Based on Cut Sets 2. 3. Risk Measurement of Multi-Project Human Resource Constrained Allocation Based on Cut Sets 3. Multi-Project Bottleneck Human Resource Constrained Allocation Model Based on Theory of Constraints 3.1. Problem Description 3.2. Model Assumptions 3.3. Model Establishment 3.4. Example Verification and Analysis Based on the Genetic Algorithm 4. Conclusion Acknowledgements References
키워드
Multi-projecttheory of constraintscut sethuman resource constrained allocationgenetic algorithm
저자
Xiu Ren [ Department of Mathematics, Daqing Normal University, Daqing, China ]
보안공학연구지원센터(IJUNESST) [Science & Engineering Research Support Center, Republic of Korea(IJUNESST)]
설립연도
2006
분야
공학>컴퓨터학
소개
1. 보안공학에 대한 각종 조사 및 연구
2. 보안공학에 대한 응용기술 연구 및 발표
3. 보안공학에 관한 각종 학술 발표회 및 전시회 개최
4. 보안공학 기술의 상호 협조 및 정보교환
5. 보안공학에 관한 표준화 사업 및 규격의 제정
6. 보안공학에 관한 산학연 협동의 증진
7. 국제적 학술 교류 및 기술 협력
8. 보안공학에 관한 논문지 발간
9. 기타 본 회 목적 달성에 필요한 사업
간행물
간행물명
International Journal of u- and e- Service, Science and Technology
간기
격월간
pISSN
2005-4246
수록기간
2008~2016
십진분류
KDC 505DDC 605
이 권호 내 다른 논문 / International Journal of u- and e- Service, Science and Technology Vol.9 No.9