Analysis of Multilevel Risk Measurement Algorithm of Software Projects Based on Grey Variable Weight Clustering Model

첫 페이지 보기
  • 발행기관
    보안공학연구지원센터(IJHIT) 바로가기
  • 간행물
    International Journal of Hybrid Information Technology 바로가기
  • 통권
    Vol.9 No.3 (2016.03)바로가기
  • 페이지
    pp.415-424
  • 저자
    Xiangang Zuo, Pengfei Liu
  • 언어
    영어(ENG)
  • URL
    https://www.earticle.net/Article/A270807

※ 원문제공기관과의 협약기간이 종료되어 열람이 제한될 수 있습니다.

원문정보

초록

영어
The development process of the software system is influenced by multi factors, thus the risk control of software projects is of vital importance. Targeting at the features including multi-factor, multilayer, fuzziness and uncertainty during the process of risk assessment of software projects, this paper analyzed the risk measurement of software projects and proposed a multilevel risk measurement algorithm of software projects based on grey variable weight clustering model. This algorithm firstly analyzed the influencing factors of the risk control of software projects, establishing a multilevel risk measurement system for software projects; next, establishing the whitenization weight functions of different measurement indexes and different measurement grades of software projects risks respectively on the basis of the grey system theory, and under the condition of considering the degree of importance of the indexes of different levels, the corresponding risk measurement algorithm of software projects based on grey variable weight clustering model was established; then the paper presented the detailed execution steps of this algorithm and discussed the detailed process to achieve the algorithm. Finally, the algorithm was verified through the case study.

목차

Abstract
 1. Introduction
 2. Multilevel risk Measurement System for Software Projects
 3. A Multilevel Risk Measurement Algorithm of Software Projects Based on Grey Variable Weight Clustering Model
  3.1. Data Normalization of Risk Measurement of Software Projects
  3.2. The Whitenization Weight Functions of the Risk Measurement of Software Projects
  3.3. Analysis of Multilevel Risk Measurement of Software Projects based on Variable Weight Clustering
  3.4. Implementing Steps of Multilevel Risk Measurement Algorithm of Software Projects
 4. Case Analysis
 5. Conclusions
 References

키워드

software projects risk measure grey variable weight clustering model multilevel measure system fuzzy algorithm

저자

  • Xiangang Zuo [ School of Information Engineering, Henan Institute of Science and Technology, Henan, Xinxiang, 453003, China ]
  • Pengfei Liu [ HEBI College Of Vocation And Technology, Henan, Hebi, 458030, China ]

참고문헌

자료제공 : 네이버학술정보

간행물 정보

발행기관

  • 발행기관명
    보안공학연구지원센터(IJHIT) [Science & Engineering Research Support Center, Republic of Korea(IJHIT)]
  • 설립연도
    2006
  • 분야
    공학>컴퓨터학
  • 소개
    1. 보안공학에 대한 각종 조사 및 연구 2. 보안공학에 대한 응용기술 연구 및 발표 3. 보안공학에 관한 각종 학술 발표회 및 전시회 개최 4. 보안공학 기술의 상호 협조 및 정보교환 5. 보안공학에 관한 표준화 사업 및 규격의 제정 6. 보안공학에 관한 산학연 협동의 증진 7. 국제적 학술 교류 및 기술 협력 8. 보안공학에 관한 논문지 발간 9. 기타 본 회 목적 달성에 필요한 사업

간행물

  • 간행물명
    International Journal of Hybrid Information Technology
  • 간기
    격월간
  • pISSN
    1738-9968
  • 수록기간
    2008~2016
  • 십진분류
    KDC 505 DDC 605

이 권호 내 다른 논문 / International Journal of Hybrid Information Technology Vol.9 No.3

    피인용수 : 0(자료제공 : 네이버학술정보)

    함께 이용한 논문 이 논문을 다운로드한 분들이 이용한 다른 논문입니다.

      페이지 저장