By introducing the theory of risk element transmission, this paper analyzes the risk of human resource allocation in a multi-project environment based on Theory of Constraints, and it analyzes qualitatively completion risk of processes depending on the bottleneck resource in a multi-project environment. Through analyzing the bottleneck of resource allocation in a multi-Project environment, we set the bottleneck buffer based on the Theory of Constraints, combined with the characteristics of human resource, and establish sharing human resource equilibrium model in a multi-project environment based on the theory of risk element transmission, providing a specific quantitative management method to alleviate the contradiction between supply and demand of sharing human resource in a multi-project environment, and give the example to prove the feasibility and effectiveness of the approach.
목차
Abstract 1. Introduction 2. Risk Analysis of Multi-Project Resource Allocation Based on the Theory of Risk Element Transmission 2.1. The Theory of Risk Element Transmission 2.2. Risk Analysis of Multi-Project Resource Allocation Based on the Theory of Risk Element Transmission 3. Multi-Project Bottleneck Human Resource Leveling Model Based on the Theory of Risk Element Transmission 3.1. Problem Description 3.2. Model Assumptions 3.3. Model Establishment 3.4. Example Verification and Analysis based on the Genetic Algorithm 4. Conclusion References
보안공학연구지원센터(IJHIT) [Science & Engineering Research Support Center, Republic of Korea(IJHIT)]
설립연도
2006
분야
공학>컴퓨터학
소개
1. 보안공학에 대한 각종 조사 및 연구
2. 보안공학에 대한 응용기술 연구 및 발표
3. 보안공학에 관한 각종 학술 발표회 및 전시회 개최
4. 보안공학 기술의 상호 협조 및 정보교환
5. 보안공학에 관한 표준화 사업 및 규격의 제정
6. 보안공학에 관한 산학연 협동의 증진
7. 국제적 학술 교류 및 기술 협력
8. 보안공학에 관한 논문지 발간
9. 기타 본 회 목적 달성에 필요한 사업
간행물
간행물명
International Journal of Hybrid Information Technology
간기
격월간
pISSN
1738-9968
수록기간
2008~2016
십진분류
KDC 505DDC 605
이 권호 내 다른 논문 / International Journal of Hybrid Information Technology Vol.8 No.12