Y. Kim, M. K. Lee, W. K. Kim, H. M. Jang, C. J. Choi, Y. W. Jo, H. J. Kim, D. Jeon
언어
영어(ENG)
URL
https://www.earticle.net/Article/A239895
※ 기관로그인 시 무료 이용이 가능합니다.
4,000원
원문정보
초록
영어
The heavy ion accelerator that will be built in Daejeon, Korea utilizes superconducting cavities operating in 2 K. The cavities are QWR (quarter wave resonator), HWR (half wave resonator), SSR1 (sing spoke resonator1) and SSR2. The main role of the cryomodule is supplying thermal insulation for cryogenic operation of the cavities and maintaining cavities’ alignment. Thermal and structural consideration such as thermal load by heat leak and heat generation, cryogenic fluid management, thermal contraction, and so on. This paper describes detailed design considerations and current results have being done including thermal load estimation, cryogenic flow piping, pressure relief system, and so on.
목차
Abstract 1. 서론 2. 저온유지모듈 열설계 2.1. 냉각온도 선정 및 냉각 시스템 2.2. 열부하 예측 2.3. 저온유지모듈의 극저온 유동 3. 결론 ACKNOWLEDGMENT REFERENCES
키워드
CryomoduleThermal insulationCryogenic flow
저자
Y. Kim [ Institute for Basic Science, Daejeon, Korea ]
M. K. Lee [ Institute for Basic Science, Daejeon, Korea ]
Corresponding author
W. K. Kim [ Institute for Basic Science, Daejeon, Korea ]
H. M. Jang [ Institute for Basic Science, Daejeon, Korea ]
C. J. Choi [ Institute for Basic Science, Daejeon, Korea ]
Y. W. Jo [ Institute for Basic Science, Daejeon, Korea ]
H. J. Kim [ Institute for Basic Science, Daejeon, Korea ]
D. Jeon [ Institute for Basic Science, Daejeon, Korea ]