Earticle

현재 위치 Home

KSS-Ⅲ 사업을 위한 제언 : 공동계약을 중심으로
Suggestions for KSS-Ⅲ Project : Focused on Joint Contract

첫 페이지 보기
  • 발행기관
    한국방위산업학회 바로가기
  • 간행물
    한국방위산업학회지 KCI 등재후보 바로가기
  • 통권
    제18권 제2호 (2011.12)바로가기
  • 페이지
    pp.148-160
  • 저자
    김동욱, 송영일
  • 언어
    한국어(KOR)
  • URL
    https://www.earticle.net/Article/A163497

※ 기관로그인 시 무료 이용이 가능합니다.

4,500원

원문정보

초록

영어
KSS-Ⅲ project, a 3000-ton-class submarine development project, is a key part of the Korean Navy's modernization programs. The contract of basic design for KSS-Ⅲ project was awarded in 2007 and work is being carried out by the joint Daewoo and Hyundai submarine design team. The lead ship construction of the class is scheduled to start in 2012.
According to Defense Project Regulation of Defense Acquisition Program Administration, companies that carry out basic design will sign a contract with the Government for construction of the lead ship. The purpose of this study is to propose the most reasonable joint contract type to apply to KSS-Ⅲ project.
Joint contract refers to the type of contract where a party is comprised of two or more persons. There are three types of joint contract.
First, a joint performance type is where contractors pool resources, funds, personnel, and materials to perform the contract and divide the proceeds
accordingly. Second, Apportionment performance is where each contractor is given responsibility for performing particular sections of the construction, and each contractor is responsible for all costs related to such performance. Third, main contractor performance is where contractors select a main contractor who is responsible for planning and operation the entire performance. The Main contractor is responsible for the performance of all; other contractors under the contract are only liable for the portion of the contract.
We reviewed the three types of joint contract according to several standards: legal applicability, subcontracting management, quality management, and recognition of construction performance. Our conclusion is that joint performance is the most suitable contract type for KSS-Ⅲ lead ship construction project.

목차

Abstract
 1. 서론
 2. 선행연구 및 이론적 고찰
  2.1 선행연구
  2.2 외국의 잠수함 공동건조 사례
  2.3 방산물자에 대한 공동계약 관련법령
  2.4 공동계약 제도
 3. 공동계약 유형별 적용가능성 분석
  3.1 공동이행 방식
  3.2 분담이행 방식
  3.3 주계약자 관리방식
 4. 결론
 참고문헌

키워드

J oint Contract KSS-Ⅲ project naval ship

저자

  • 김동욱 [ Kim, Dong Uk | 국방대학교 국방관리대학원 군사학 박사과정 ] 교신저자
  • 송영일 [ Song, Young Il | 국방대학교 국방관리대학원 부교수 ]

참고문헌

자료제공 : 네이버학술정보

간행물 정보

발행기관

  • 발행기관명
    한국방위산업학회 [Korean Association of Defense Industry Studies]
  • 설립연도
    2000
  • 분야
    사회과학>군사학
  • 소개
    본 회는 국방 및 방위산업에 관한 학술적 조사연구와 정보교류를 통하여 이론과 기술정보체계를 정립하고 방위산업에 관한 학술적 자료의 개발보급과 국제협력 사업의 강화를 꾀함으로써 국방 및 방위산업 발전에 기여함을 목적으로 한다.

간행물

  • 간행물명
    한국방위산업학회지 [Journal of the Korean Association of Defense Industry Studies]
  • 간기
    연3회
  • pISSN
    1738-6144
  • 수록기간
    2000~2025
  • 등재여부
    KCI 등재
  • 십진분류
    KDC 390 DDC 355

이 권호 내 다른 논문 / 한국방위산업학회지 제18권 제2호

    피인용수 : 0(자료제공 : 네이버학술정보)

    함께 이용한 논문 이 논문을 다운로드한 분들이 이용한 다른 논문입니다.

      페이지 저장