건축주가 직접 발주한 석면해체공사 도급의 타당성에 관한 연구
Practical Reasonability for Introducing Separate Contract Award System Concerning Asbestos Removal

첫 페이지 보기
  • 발행기관
    대한안전경영과학회 바로가기
  • 간행물
    대한안전경영과학회지 KCI 등재 바로가기
  • 통권
    제13권 제2호 (2011.06)바로가기
  • 페이지
    pp.259-266
  • 저자
    손기상, 갈원모, 김형석
  • 언어
    한국어(KOR)
  • URL
    https://www.earticle.net/Article/A155593

※ 기관로그인 시 무료 이용이 가능합니다.

4,000원

원문정보

초록

영어
Project owner, asbestos removal specialist, experts on asbestos removal work, as counter parts to be defined in the study to make out research goals have been asked with questionnaire survey and replied with 65, 275, 32 cases, respectively. And additionally, direct interview 73 sheets have been collected to find out current status of required engineers and equipments assigned and provided to the field, from them, three(3) concerned parties. Questionnaire subjects are composed of common items, reasonable unit cost, need of separate contract-awarding system, status of performing standard contract, status of providing legal engineers and equipments. Concentrated review of two~three questions by subject has been made to find out and compare idea results between three(3) concerned parties. First, legal and practical work status survey have been made to determine reasonability of introducing separate contract-awarding system, as a part of ensuring reasonable unit work cost. And then, two different status have been compared and there is introduction possibility of separate contract-awarding system, it is found out. The possibility of separate contract also has been confirmed by comparison of domestic legal grounds. Justificating grounds to introduce separate contract-awarding system have been shown. Standard contract status between asbestos removal specialists has been compared using two cases of providing removal work contract and receiving it. It is shown that case of 50 percent or less contains 38.5% when they receive contract, but only 10 percent reduction of original contract amount has been made when they provide it. It means that asbestos removal specialists do not keep occupational safety and health regulations.

목차

Abstract
 1. 서론
  1.1 연구배경
  1.2 연구목적
 2. 연구방법
  2.1 국내ㆍ외 관계법령 고찰
  2.2 설문조사 방법
 3. 설문조사 결과
  3.1 설문결과
  3.2 분리발주 도입의 필요성
  3.3 교차분석 결과
 4. 분석
 5. 토의 및 결론
 6. 참고문헌

키워드

project owner asbestos removal specialists separate contract-awarding system

저자

  • 손기상 [ Ki-Sang Son | 서울과학기술대학교 안전공학과 ]
  • 갈원모 [ Won-Mo Gal | 을지대학교 보건환경안전학과 ] 교신저자
  • 김형석 [ Hyoung-Suk Kim | 산업안전보건연구원 ]

참고문헌

자료제공 : 네이버학술정보

간행물 정보

발행기관

  • 발행기관명
    대한안전경영과학회 [Korea Safety Management & Science]
  • 설립연도
    1999
  • 분야
    공학>안전공학
  • 소개
    안전경영에 관한 학문과 기술을 발전,보급,응용하여 안전기술 및 관리기술의 진흥에 공헌하며, 재해예방을 통한 안전사회의 구현을 그 목적으로 함.

간행물

  • 간행물명
    대한안전경영과학회지 [Journal of Korea Safety Management & Science]
  • 간기
    계간
  • pISSN
    1229-6783
  • eISSN
    2288-1484
  • 수록기간
    1999~2025
  • 십진분류
    KDC 530 DDC 620

이 권호 내 다른 논문 / 대한안전경영과학회지 제13권 제2호

    피인용수 : 0(자료제공 : 네이버학술정보)

    함께 이용한 논문 이 논문을 다운로드한 분들이 이용한 다른 논문입니다.

      페이지 저장