Scheduling of dismantling old research reactor need to consider time, cost and safety for the worker. The biggest issue when dismantling facility for research reactor is safety for the worker and cost. Large portion of a budget is spending for the labor cost. To save labor cost for the worker, reducing a lead time is inevitable. Several algorithms applied to reduce read time, and safety considered as the most important factor for this project. This research presents three different dismantling scheduling scenarios. Best scenario shows the specific scheduling for worker and machine, so that it could save time and cost
목차
Abstract 1. 서론 2. 차폐체 해체 요구사항 2.1 피폭량 정의 2.2 해체 정보 3. 차폐체 해체 시나리오 3.1 차폐체 해체 시나리오 I 3.2 차폐체 해체 시나리오 II 3.3 차폐체 해체 시나리오 III 4. 결과 분석 및 결론 5. 참고문헌
키워드
Research reactorScheduling optimizationSafetyDismantling procedure