Seung Ryul Lee, Jae-young Yoon, Jong-young Park, Byongjun Lee
언어
영어(ENG)
URL
https://www.earticle.net/Article/A118420
※ 기관로그인 시 무료 이용이 가능합니다.
※ 학술발표대회집, 워크숍 자료집 중 4페이지 이내 논문은 '요약'만 제공되는 경우가 있으니, 구매 전에 간행물명, 페이지 수 확인 부탁 드립니다.
4,000원
원문정보
초록
영어
This paper proposes the bus-tie application scheme of 154 kV SFCL (superconducting fault current limiter) in Korean power system. The reduced amount of fault current by SFCL is different by where the SFCL is installed. Therefore the inflow ratio of fault current (IRFC) is suggested to consider the effect of an SFCL’s location. The proposed scheme was applied to the Korean Power System of 2010, and fault currents were calculated and analyzed with this coefficient. Simulations show that the location with high IRFC is adequate to install SFCL but more consideration of other things is required to determine the location and capacity of SFCL.
목차
Abstract 1. INTRODUCTION 2. THE INFLOW RATE OF FAULT CURRENTS 3. APPLICATION METHOD OF SFCL 4. SIMULATION RESULTS 5. CONCLUSION REFERENCES
저자
Seung Ryul Lee [ 이승렬 | 한국전기연구원 ]
Corresponding author