A contract dispute is an inevitable factor in construction project. Because of this dispute, many contract parties may have difficulties escaping a lot of contract risks. The best choice is to solve the risks without conflict. Some matters go beyond the ability of Construction Manager or Supervisor, and these may reach the limit of patience. Recently some Owner are introducing Dispute Review Board(DRB), a type of ADR. To universally introduce DRB, the impartiality of DRB participants should be verified. Therefore the concept of the neutrality in Mediation were studied, and Mediation described in the Framework Act on the Construction Industry were analyzed, and the manner to guarantee the neutrality of DRB participants were suggested in this study.

목차

Abstract
 1. 서 론
  1.1 연구의 배경과 목적
  1.2 연구의 방법 및 절차
 2. 예비적 고찰
  2.1 중립성의 의의
  2.2 현장협의체의 개념
  2.3 연구동향
 3. 건설분쟁조정기구의 중립성
  3.1 국제계약분쟁조정위원회
  3.2 건설분쟁조정위원회
  3.3 계약분쟁자문소위원회
  3.4 검토 결과
 4. 현장협의체의 중립성
  4.1 현장협의체의 개요
  4.2 사전분쟁조정위원회
  4.3 분쟁조정위원회
  4.4 분석 결과
 5. 현장협의체의 중립성담보 방안마련
  5.1 위원 선정방식의 적합성
  5.2 위원선정의 평등성
  5.3 계약당사자의 위원선정 승인권
  5.4 특별관계 부존재와 총괄
  5.5 중립성 구성요소 검증
 6. 결론
 참고문헌

저자

  • 김동성 [ Kim, Dong-Seong | 서울시립대학교 대학원 박사과정 ]
  • 조영준 [ Cho, Young-Jun | 중부대학교건축공학과 교수 ]
  • 현창택 [ Hyun, Chang-Taek | 서울시립대학교 건축학부 교수 ]
  • 홍태훈 [ Hong, Tae-Hoon | 서울시립대학교 건축학부 조교수 ]

참고문헌

자료제공 : 네이버학술정보

    간행물 정보

    • 간행물
      대한건축학회연합논문집 [Journal of the Regional Association of Architectural Institute of Korea]
    • 간기
      격월간
    • pISSN
      1229-5752
    • 수록기간
      1999~2026
    • 등재여부
      KCI 등재
    • 십진분류
      KDC 540 DDC 690