The insistence of rights and interests in contract is being generalized by opening in construction market which is following F.T.A, internationally. Conditions of contract in construction have different specialities compared with other industries. Different conditions of contract should be established because of a specific character that is different from each construction, such as work, environment, circumference conditions. Although the order of Turn-key is being
expanded by increasing construction scale and demanding hybrid function, the suitable regulations of contract are not settled. As a result, various factors of claim is occurring in Change Order-Claim, because they just obey a part of guide-line. This study suggests useful analysis method in detail concerned with the main factor of Change Order-Claim by each D/B phases.

목차

Abstract
 1. 서론
  1.1 연구의 배경 및 목적
  1.2 연구범위 및 방법
 2. Design-Build방식의 특성
  2.1. D/B방식의 개요
  2.2 D/B방식의 특성파악
  2.3 D/B사업의 클레임
 3. 설계변경 클레임요인의 도출 및 분류
  3.1 국내사례조사 및 전문가 면담
 4. 클레임요인의 중요도 분석
  4.1 중요도 분석을 위한 계층구조의 구성
  4.2 중요도 측정 및 척도
  4.3 요인의 가중치 산정
 5. 결론
 참고문헌

저자

  • 김대길 [ Kim Dae-Gil | 정회원, 동의대학교 건축공학과, 석사과정 ]
  • 정호근 [ Jeong Ho-Geun | 정회원, 동의대학교 건축공학과, 석사과정 ]
  • 황재우 [ Hwang Jae-woo | 정회원, 동의대학교 건축공학과, 석사과정 ]
  • 이상범 [ Lee Sang-beom | 정회원, 동의대학교 건축공학과 조교수, 공학박사 ]

참고문헌

자료제공 : 네이버학술정보

    간행물 정보

    • 간행물
      대한건축학회지회연합회 학술발표대회논문집
    • 간기
      부정기
    • 수록기간
      2005~2013
    • 십진분류
      KDC 540 DDC 690