In this study, we select a site adopting real composite precast concrete method. Estimating real construction cost and imaginary cost appling reinforced concrete method in the site, we compare the costs. Through using high intensity concrete and prestressed concrete, amount of concrete is reduced more than 50% but there isn`t big gap in material cost. In the main construction cost of composite precast concrete method, the material cost with production cost and transportation cost are in that, joints and topping concrete are account for 90%. But in case of reinforced concrete, labor cost spent at concrete steel bar and form is account for 30%. In the cost of attached, compared with composite precast concrete method, the reinforced concrete method taken in big portion by temporary work and scaffolding is twice as much as composite precast concrete method in construction cost. Therefore, economic efficiency is excellent reducing 11% total cost of composite precast concrete method from the reinforced concrete method.
목차
Abstract 1. 서론 1.1 연구의 배경 및 목적 1.2 연구방법 및 범위 2. 경제성 분석 2.1 개요 2.2 공사비 산출 2.3 공사비를 통한 경제성 분석 3. 결론 참고문헌