Abstract
Ⅰ. Introduction
Ⅱ. Legal requirement to determine damages under contract
Ⅲ. The Issue of Defining the Types of Damages Arising from a Breach of Contract (Loss of Currence Rate, Wasted Expenditure)
Ⅳ. Application of methods to limit damages
Ⅴ. CONCLUSION
References
<국문요약>