학교시설 복합화 사업의 경제적 가치 평가에 관한 연구 - 부산 남구 우암초등학교를 대상으로 -
A Study on the Estimation of the Economic Valuation in Mixed-Use School Project - Through the Case of the Woo-am Elementary School in Nam-gu, Busan -

  • 간행물
    대한건축학회연합논문집 KCI 등재 바로가기
  • 권호(발행년)
    제21권 제3호 통권 91호 (2019.06) 바로가기
  • 페이지
    pp.61-70
  • 저자
    김민재, 고인석
  • 언어
    한국어(KOR)
  • URL
    https://www.earticle.net/Article/A356886

원문정보

초록

영어
The purpose of this study is to estimate the economic valuation of Mixed-Use School project. In this regard, there are two main points of interest of this study. The first is the increase in social welfare through the Mixed-Use School project, that is, the social benefits. It is necessary to consider whether the project should be promoted or not based on the total benefits of the project and its characteristics, not the vague reason that the project needs to be done because it can effectively supply the quality basic living facilities by effectively utilizing the empty classrooms and the idle space. Second, whether the benefit of the project is limited within the target area or whether there is benefit in other areas than the target area. It is important to verify the awareness and benefits of residents in the surrounding area on the project, since the project should be basically carried out by the citizens' tax. If there is a benefit in the non-business area, that is, an increase in social welfare, it can secure the right in the promotion of the project. It will also provide information on the extent to which potential customers of the project can be expanded, as well as information on the introduction of detailed programs and facilities. As a result, the average amount of payment for Busan citizens was 4,095won, the average payment amount for residents outside Wooam-dong was 4,508won, and the average payment amount for residents of Wooam-dong area was 3,639won. The total social benefit was estimated to be about 59.824billion won for Busan, about 241million won for Wooam-dong, and 65.559billion won for Wooam-dong. Considering that the total project cost of the Eomgumg Elementary School, which was the first facility complex project in Busan, is about 8.8billion won, the economic feasibility of the project is highly likely to be secured. In addition, the amount for payment in other areas is about 23.9% higher than the area where the project is planned. This will be the focus of attention in the process of future business promotion and subsequent research.

목차

Abstract
1. 서론
1.1. 연구의 배경과 목적
1.2 연구의 대상과 방법
2. 선행연구 검토
2.1 학교시설 복합화에 관한 연구
2.2 조건부가치추정법을 이용한 가치 추정 연구
2.3 외부효과에 관한 이론적 검토
3. 우암동과 우암동 외 지역 간 비교
4. 조건부가치추정법과 설문 설계 및 방법
4.1 조건부가치추정법을 이용한 추정 방법
4.2 설문 설계 및 방법
5. 평가결과 및 함의
5.1 공변량을 포함한 모형
5.2 공변량을 제외한 모형
6. 결론
REFERENCES

저자

  • 김민재 [ Kim, Min-Jae | 인제대학교 건축학과 겸임교수, 도시계획학박사 ]
  • 고인석 [ Ko, In-Seok | 인제대학교 건축학과 교수, 공학박사 ] Corresponding Author

참고문헌

자료제공 : 네이버학술정보

    간행물 정보

    • 간행물
      대한건축학회연합논문집 [Journal of the Regional Association of Architectural Institute of Korea]
    • 간기
      격월간
    • pISSN
      1229-5752
    • 수록기간
      1999~2026
    • 등재여부
      KCI 등재
    • 십진분류
      KDC 540 DDC 690