Abstract
요약
1. Introduction
2. Trans-Eurasia Routes from South Korea
3. Baseline Simulation Model for Shippmg Logistics in South Korea
3.1 Baseline Data for Modeling
3.2 Developing a Baseline Simulation Model
4. Trans-Eurasia Railway Model ofSouth Korea
5. Conclusion
REFERENCES
Appendix