Most construction site is observed. The procurement process shall not be carried out smoothly. among them curtain wall construction is total cost of about 10 ~ 15% occupies each major process step-by-step, about 30 companies are involved. reasons and problems existing in the process of being wasted appears. This study, the problems associated with the analysis of the problem by reviewing the existing research, Improvements derived and this improvements from curtain wall construction through the introduction of proceed with the potential to improve basic research through the introduction for Supply Chain Management system.
목차
Abstract 1. 서론 1.1 연구의 배경 및 목적 1.2 연구의 범위 및 방법 2. 이론적 고찰 2.1 공급망의 정의 2.2 기존의 프로세스와 공급망관리의 비교 3. 프로세스 협업의 낭비요인 및 문제점 도출 4. 공급망관리를 적용시 영향도 분석 5. 결론 및 향후 계획 참고문헌