BIM을 활용한 건축 기획단계 업무 지원에 관한 연구
A Study on Application BIM for Performance Support of Construction Pre-Design

  • 간행물
    대한건축학회연합논문집 KCI 등재 바로가기
  • 권호(발행년)
    제12권 제1호 통권 41호 (2010.03) 바로가기
  • 페이지
    pp.191-198
  • 저자
    박동진, 이상범
  • 언어
    한국어(KOR)
  • URL
    https://www.earticle.net/Article/A117787

원문정보

초록

영어
Nowadays, as the construction industry is becoming larger and complicated, a vast amount of information in each step and field is created. Nonetheless, because these information and data aren't going through integrated management, identification and revision of information aren't sufficiently happening and many problems that increase the duration/cost of the project such as disagreement/omittance of information and redundant business operations are apparent. To deal with these issues, recently in the construction industry, an integrated management plan using BIM(Building Information System) which can create and manage data needed in the whole life cycle of buildings, from the conceptual design stage to the maintenance stage, has been started. Currently in the industry, there are numerous researches that are in progress to utilize BIM in construction projects. In particular in designing and constructing, researches seeking for a more efficient project using BIM are vigorously in process. However, in the case of pre-design phase, even though it is a stage where diverse important decisions for the whole project are created, research for efficient use of project information or maintenance are inadequate. Also, as the plan's characteristic varies by the purpose, the central body, and external factors of the construction project, and the far-reaching goal of construction planning makes it difficult to manualize the planning process into a preset. In this, this research assumed the limitation of the inability to organize the planning operation into an uniform set of planning stages, and proceeded the study of the usage of BIM in the construction industry only in the designing and constructing process to using the BIM process to aid the decision making of the ordering body and other participants of the project created in the pre-design phase.

목차

Abstract
 1. 서론
  1.1 연구의 배경 및 목적
  1.2 연구의 범위 및 방법
 2. 이론적 고찰
  2.1 BIM (Building Information Modeling)
  2.2 건축기획
 3. 건축기획 BIM
  3.1 건축기획 BIM의 개념
  3.2 건축기획 BIM의 역할
  3.3 건축기획 BIM의 프로세스
  3.4 주요 발주방식별 기획 BIM의 범위
 4. 건축 기획단계 BIM 적용 방안
  4.1 데이터 수집/분석
  4.2 프로젝트 관련 요구사항 분석
  4.3 개념설계 및 건축 기본계획
  4.4 관리 운영계획
 5. 결론
 참고문헌

저자

  • 박동진 [ Park, Dong-Jin | 동의대학교 건축공학과 석사과정 ]
  • 이상범 [ Lee, Sang-Beom | 동의대학교 건축공학과, 부교수, 공학박사 ] 교신저자

참고문헌

자료제공 : 네이버학술정보

    간행물 정보

    • 간행물
      대한건축학회연합논문집 [Journal of the Regional Association of Architectural Institute of Korea]
    • 간기
      격월간
    • pISSN
      1229-5752
    • 수록기간
      1999~2026
    • 등재여부
      KCI 등재
    • 십진분류
      KDC 540 DDC 690