The purpose of this study was to control inflow rate and surcharging of conduit and rainfall storage on a site using SWMM program. Rainfall storage location and storage volume can be decided by SWMM program. The maximum hours surcharged of junction is 3.13 hour without rainfall storage but is 2.07 hour with rainfall storage. The inflow rate of conduit 2.39㎥/s on C3 without rainfall storage while inflow rate of C3 with rainfall storage is 0.99㎥/s.
목차
Abstract 1. 서론 1.1 연구의 목적 1.2 연구방법 2. SWMM 프로그램 고찰 3. SWMM을 활용한 유출량 및 유출시간 3.1 강우량 조사 3.2 입력자료의 특성 4. 시뮬레이션 결과 4.1 우수저류조를 설치하지 않은 경우 4.2 우수저료조를 설치한 경우 5. 결론 참고문헌