건설공사의 작업제반요건분석 체크리스트에 관한 연구
A Study on Constraint Analysis Checklist of Construction Project

  • 간행물
    대한건축학회지회연합회 학술발표대회논문집 바로가기
  • 권호(발행년)
    2008년도 추계학술발표대회 (2008.12) 바로가기
  • 페이지
    pp.437-442
  • 저자
    한정훈, 김대영, 이학기
  • 언어
    한국어(KOR)
  • URL
    https://www.earticle.net/Article/A103342

원문정보

초록

영어
The purpose of construction project management is to achieve planned quality by adequate cost and schedule of the project, thus the effective time management is a critical factor to actualize the object. But the traditional time management by using milestone has several limitations which are not sufficiently considered mutual relation and variated from the task. On this wise,
applying the concept and principles of lean construction to the project will be the best way not only reduce waste and variation, but also improve the productivity and ability to overcome limitation as mentioned above. Thus the study, Last Planner System, specially focuses on constraint analysis which is used in lookahead planning system. The results of this research will provide the constraint analysis checklist that is able to improve work reliable and percent plan complete when time planning by controlling constraints of project.

목차

Abstract
 1. 서론
  1.1 연구의 배경 및 목적
  1.2 연구의 범위 및 방법
 2. 작업제반요건분석 개념 및 적용 현황 조사
  2.1 작업제반요건분석 개념
  2.2 조사개요
  2.3 조사결과 및 분석
 3. 작업제반요건의 분류
  3.1 작업제반요건 식별
  3.2 작업제반요건 분류
  3.3 작업제반요건 중요도 분석
 4. 체크리스트 작성 및 활용 방안
  4.1 체크리스트 작성
  4.2 체크리스트 활용 방안
 5. 결론
 참고문헌

저자

  • 한정훈 [ Han, Jung-Hun | 동아대 대학원 석사과정 ]
  • 김대영 [ Kim, Dea-Young | 경남대 건축학부 조교수, 공학박사 ]
  • 이학기 [ Lee, Hak-Ki | 동아대 건축학부 교수, 공학박사 ]

참고문헌

자료제공 : 네이버학술정보

    간행물 정보

    • 간행물
      대한건축학회지회연합회 학술발표대회논문집
    • 간기
      부정기
    • 수록기간
      2005~2013
    • 십진분류
      KDC 540 DDC 690